The owner approved a change, but production is still working from the old drawing
The result: rework, lost man-hours and a tense conversation with the owner.
Paweł Jacheć · Jabitec · consulting
For 6 years I ran a yacht shipyard. I know what a change agreed with the owner after construction has started means for production. Today I help companies get that kind of information flowing, keep costs under control and choose tools that fit the way their team works.
Three situations I know first-hand from the shop floor and the shipyard office.
The result: rework, lost man-hours and a tense conversation with the owner.
Costs and hours are recorded somewhere, but nobody compares them with the plan during the build.
Everyone remembers it a little differently, and the owner is waiting for an answer.
I don't start by picking a system. First I look at how work really flows in your company.
The project manager, the design engineer, the shop-floor foreman, purchasing and service. I ask where they lose time and what they wait for.
We take one real vessel: from the quote, through changes and purchasing, to delivery and service. We mark where information or time gets lost.
The one that shows results fastest at the lowest cost. The rest waits its turn.
What to fix first, what later, and why.
What's worth implementing, what your current systems can already do, and what isn't worth paying for.
One or two simple measures, e.g. the number of rework jobs after a drawing change, or the gap between planned and actual hours.
Examples of what's possible. I fit the solution to your team, not the other way round.
Once a drawing revision is approved, production gets a notification and the previous version is marked as superseded.
Every week it compares planned and actual man-hours for the vessel, so deviations show up during the build.
Ask it “what did we agree with the owner about the deck?” and it finds the earlier agreement and points to the source document.
Every service ticket has an owner, a deadline and the full history of agreements in one place.
These are examples of possible solutions, not descriptions of specific implementations.
If you're looking for a subcontractor or want to get your offer in front of shipyards, I can introduce you to companies I've worked with.
For 20 years I've worked with yachts and workboats. I started in after-sales service at Sunreef Yachts, where I got to know yachts inside out. Later I sold them at Sunreef and Galeon. For six years I ran a shipyard that my team and I built from scratch. There we designed and built dozens of vessels.
At Jabitec I combine my shipyard experience with work on AI, VR and IT systems. I help shipyards and marine companies get information flowing between the office and the shop floor, and choose tools that make it easier to keep build schedules and costs on track.
Tell me what you want to improve or what you're planning. We'll talk about where to start.
Book a call